Archive | January, 2012

Todd Shipyards copper cleanup

January 31, 2012

0 Comments

Todd Shipyards/Site 28.  Dog Park to left of fence, Port of Oakland on right.

Right next to the Main Street Ferry Terminal, between the Oakland Estuary and the Dog Park, is the Navy’s cleanup Site 28, also known as the Todd Shipyards site.  The contamination at this site — copper and arsenic, and to a lesser extent lead and hydrocarbons — was not the result of Navy activities, even [...]

Continue reading...

Precision Dredging at the Pier Area – with video

January 20, 2012

0 Comments

Dredging at Pier 1 - Alameda Point

Designing the workplan for dredging toxic sediment next to Pier 1 at Alameda Point required precision so as not to undermine the stability of the concrete posts supporting the roadway that passes along the pier area.  The ground under the water slopes down nearly 40 feet from the cement parking slab adjacent to Wharf Road.  [...]

Continue reading...